ASREV
From Serenity : The Wiki
news ASREV
|
|
Settings for Low Power Operation
For prolonged operation at half throttle, such as CAP or picket duty, set reactor power to 85MW and engines to 12MW
.--------------------------------------------------------------------. | Engineering Systems Report AEC Gold-1 | >------------------------------------------------------------------< | System Status Power Stress Damage | | Engines Online 12 (24) 0% None | | Internal Computer Online 13 (13) 0% None | | Sensor Array Online 25 (25) 0% None | | Maneuv. Thrusters Online 30 (30) 0% None | | Comm. Array Offline 0 (40) 0% None | | Life Support Online 5 (5) 0% None | >------------------------------------------------------------------< | +- Computer Status -+ | | Power Usage: 9/13 Surplus: 4 | | Consoles : 4 Powered: 2 | >------------------------------------------------------------------< | +- Reactor Status -+ | | Type : Reactor Output: 85/85(0/140) | | Stress: 0% Damage: None | >------------------------------------------------------------------< | +- Fuel Status -+ | | Storage Level: 99% | `--------------------------------------------------------------------'